← All Counties

Haskell County

Last updated

4 tracked AI data center projects in Haskell County, Texas, 1.5 GW of disclosed planned capacity across 3 of them. Status: 2 under construction, 2 pre-construction.

4Tracked projects
1.5 GWDisclosed capacity
6Operators
1.64MW per sq mi903.1 sq mi of land

Status

  • 2 Under construction
  • 2 Pre-construction

Power strategy

  • 1 Off-grid
  • 3 Hybrid (grid + on-site)

Projects

  • Last Energy PWR-20 Microreactor Park Pre-construction · 600 MW · Haskell

    A proposed 600 MW behind-the-meter nuclear power park: Last Energy plans to deploy 30 factory-built PWR-20 microreactors on a 200-acre Haskell County site to provide private-wire baseload power to regional data centers, bypassing ERCOT interconnection entirely except for surplus export. Still in pre-licensing, with an NRC Early Site Permit application in preparation and no construction underway, tracked as a dedicated power-generation asset supporting the county's broader data center buildout, not as a data center itself.

  • Google Journey Campus Under construction · 440 MW · Haskell (≈55 mi north of Abilene; northern Haskell County)

    Google's northern Haskell County campus (Homebound Group LLC) is actively under construction on ~300 acres along Red Creek Road: JNR1A and JNR2A, together ~495,700 sq ft and $800M, broke ground in April and June 2026 under a June 2025 tax abatement that requires $1B minimum Phase 1 investment and 50 permanent jobs. Renamed from the tracker's earlier generic 'North' label to Google's own 'Journey' project designation.

  • Google Thelma Campus Under construction · 440 MW · Haskell (near the Jones County line)

    Google's southern Haskell County campus (Homebound Group LLC), paired with the 640 MW/1.3 GWh Quantum Clean Energy solar-and-battery park that Alphabet now owns outright via its $4.75B Intersect Power acquisition. THM1A and THM2A are under active construction toward a projected 440 MW, ~1.4M sq ft five-building campus. Renamed from the tracker's earlier generic 'Solar + Storage' label to Google's own 'Thelma' project designation.

  • Google Ranger Campus Pre-construction · — · Haskell

    Google's third Haskell County campus and its largest single land tract in the county: a 661-acre, up-to-six-phase development (Ascendant Site Solutions LLC) approved for a 10-year tax abatement in April 2026, but still in pre-construction planning while Google prioritizes the actively-building Thelma and Journey campuses.