Google Journey Campus

Last updated

Project Journey · North Haskell County Campus · Homebound Group LLC (formerly tracked as "Google Haskell County Campus (North)")
Under construction

Google's northern Haskell County campus (Homebound Group LLC) is actively under construction on ~300 acres along Red Creek Road: JNR1A and JNR2A, together ~495,700 sq ft and $800M, broke ground in April and June 2026 under a June 2025 tax abatement that requires $1B minimum Phase 1 investment and 50 permanent jobs. Renamed from the tracker's earlier generic 'North' label to Google's own 'Journey' project designation.

440 MWPlanned power
Developer
Homebound Group LLC (Google special-purpose entity)
Owner
Google
Tenant
Google (cloud + AI)
Power detail
~440 MW projected total electrical facility capacity at Google's standard five-building full buildout; actual IT load not publicly disclosed
Power source
Grid-connected hybrid, drawing on Google's broader ERCOT PPA portfolio (6,200+ MW of contracted wind/solar statewide); a dedicated on-site Homebound Group Wastewater Treatment Plant (1,645 sq ft, $11.68M, Aug 3 2026 to Nov 1 2027 construction window) supports utility needs
Cooling
Closed-loop air-cooling; water withdrawals limited to domestic/standard operations use
Compute
Not disclosed
Construction start
Apr 1, 2026 (JNR1A) · Jun 23, 2026 (JNR2A)
Est. completion
Late Aug 2027 (JNR1A target) · Late Oct 2027 (JNR2A target: year inferred from engineering estimates aligning with JNR1A and the wastewater plant; early filings omitted the year)
Grid strategy
Hybrid (grid + on-site)
County
Haskell
Nearest city
Haskell (≈55 mi north of Abilene; northern Haskell County)
Announced
2025-11-14