Google Thelma Campus

Last updated

Project Thelma · South Haskell County Campus · Homebound Group LLC · Quantum Clean Energy Project (Intersect Power) (formerly tracked as "Google Haskell County Campus (Solar + Storage)")
Under construction

Google's southern Haskell County campus (Homebound Group LLC), paired with the 640 MW/1.3 GWh Quantum Clean Energy solar-and-battery park that Alphabet now owns outright via its $4.75B Intersect Power acquisition. THM1A and THM2A are under active construction toward a projected 440 MW, ~1.4M sq ft five-building campus. Renamed from the tracker's earlier generic 'Solar + Storage' label to Google's own 'Thelma' project designation.

440 MWPlanned power
Developer
Homebound Group LLC (Google special-purpose entity); predecessor Cloud West Inc. held the original Apr 26, 2022 abatement, assigned to Homebound Feb 24, 2025
Owner
Google
Tenant
Google (cloud + AI)
Power detail
~440 MW estimated total electrical facility capacity at five-building full buildout (not officially disclosed by Google); IT load remains a closely guarded corporate secret
Power source
Hybrid grid + co-located Quantum Clean Energy Project (Intersect Power, acquired by Alphabet Inc. for ~$4.75B cash, closed Mar 10, 2026): 640 MW solar PV + 1.3 GWh Tesla Megapack battery storage; interconnected via Electric Transmission Texas (ETT) 345kV transmission through the dedicated Kilby 345kV switching station (3-breaker ring, SSO relaying)
Cooling
Closed-loop air-cooling (no evaporative cooling towers); operational water use limited to domestic/sanitary plumbing
Compute
Not disclosed
Construction start
Jun 18, 2025 (THM1A) · Dec 1, 2025 (THM2A)
Est. completion
Apr 16, 2027 (THM1A target) · Mar 15, 2028 (THM2A target)
Grid strategy
Hybrid (grid + on-site)
County
Haskell
Nearest city
Haskell (near the Jones County line)
Announced
2025-11-14