1 GW bitcoin campus pivoting to AI/HPC
Partially operational

Riot froze the second half of its 1 GW Corsicana bitcoin campus to chase AI instead, and the May 2026 "Project Ditto" permit for a $400M, 335,000 sq ft building is the first concrete step.

1.0 GWPlanned power1 GW total site; ~400 MW Phase 1 operating (bitcoin); ~600 MW redirected toward AI/HPC
Developer
Riot Platforms (NASDAQ: RIOT)
Owner
Riot Platforms
Tenant
TBD: filing doesn't specify AI/HPC tenant vs. self-use
Power source
ERCOT grid via a direct 345 kV transmission interconnection; 1 GW of fully approved capacity carried over from the mining buildout, about 400 MW of it currently energized.
Cooling
Not disclosed
Compute
TBD
Construction start
Campus construction began in 2023 and the site was operational by 2024 per Riot's project page; the $400M Project Ditto building was permitted in May 2026.
Est. completion
TBD
Grid strategy
ERCOT grid
County
Navarro
Nearest city
Corsicana (~55 mi SE of Dallas)
Announced
2026-05-30