2 tracked AI data center projects in Navarro County, Texas, 1.0 GW of disclosed planned capacity across 2 of them. Status: 1 partially operational, 1 early works / site prep.

2Tracked projects
1.0 GWDisclosed capacity
2Operators
0.99MW per sq mi1,009.7 sq mi of land

Status

  • 1 Partially operational
  • 1 Early works / site prep

Power strategy

  • 2 ERCOT grid

Projects

  • Riot Corsicana “Project Ditto” Partially operational · 1.0 GW · Corsicana (~55 mi SE of Dallas)

    Riot froze the second half of its 1 GW Corsicana bitcoin campus to chase AI instead, and the May 2026 "Project Ditto" permit for a $400M, 335,000 sq ft building is the first concrete step.

  • EG AI Corp Dallas GPU Data Center Early works / site prep · 3 MW · Rice

    The newest entry on the board: a small but pointed bet that the mid-market ("structurally excluded from the DFW buildout") needs its own sovereign, immersion-cooled GPU capacity.