Prometheus Hyperscale Pecos Campus

Last updated

Pre-construction

A proposed hyperscale campus in Reeves County near Pecos, planned by Prometheus Hyperscale with Istmo Energy for 1.5 GW of Phase 1 IT capacity and a path to about 2.5 GW. The design runs the first phase behind its own generation rather than through the ERCOT queue. No binding tenant has been announced and no construction has started.

1.5 GWPlanned power
Developer
Prometheus Hyperscale (Istmo Energy as energy partner)
Power detail
Phase 1 planned IT capacity as described by the developer, with a stated path to about 2.5 GW. Nothing is contracted, permitted or built. The developer says 100 to 150 MW of modular compute could be delivered during 2027 if a customer commits early enough.
Power source
Pipeline natural gas for the initial generation fleet, with ethane from a planned Istmo fractionation facility as a second fuel later
Cooling
Closed-loop, as described by the developer; no permits or engineering reviewed
Grid strategy
Behind-the-meter gas
County
Reeves
Nearest city
Pecos
Announced
2026-08-24