← All Projects

Crusoe–Lancium Childress Campus

Last updated

Pre-construction

Announced Jul 15, 2026: a 1.0 GW grid-connected AI campus on 270 Lancium-owned acres in Childress County, for an unnamed hyperscaler. It is the second site on the Crusoe-Lancium structure used at Stargate Abilene, Lancium owns the land and the interconnect, Crusoe designs, builds and operates. Distinct from the tracked iren-childress-horizon conversion, which is a different operator and site in the same county. Found while sweeping google-armstrong; the only source retrieved is Crusoe's own announcement, hence 'reported' rather than 'confirmed'.

1.0 GWPlanned power
Developer
Crusoe (designs, builds and operates the facility)
Owner
Lancium (owns the land and the energy infrastructure)
Tenant
Undisclosed: 'a leading hyperscale technology company'
Power detail
1.0 GW announced for the campus; grid-connected, with Lancium securing the power interconnect and managing energy orchestration. No IT-load figure disclosed.
Cooling
Closed-loop, non-evaporative liquid cooling; on-site energy storage
Construction start
Q3 2026 (expected, per the Jul 15, 2026 announcement)
Grid strategy
ERCOT grid
County
Childress
Nearest city
Childress (Texas Panhandle)
Announced
2026-07-15