Alpha Digital Campus

Last updated

PowerBridge × LandBridge Waha campus
Pre-construction

LandBridge's flagship 'powered land' play: Five Point-backed PowerBridge holds an option on ~3,400 acres near the Waha Hub for a pad-ready, private-use-network campus of up to 2 GW on co-located combined-cycle gas, advancing incrementally, starting with a 58.3 MW ERCOT filing.

2.0 GWPlanned power
Developer
PowerBridge LLC (an affiliate of Five Point Infrastructure)
Owner
PowerBridge LLC; land leased from LandBridge Company LLC
Tenant
Hyperscale cloud and AI infrastructure operators (targeted; none disclosed)
Power detail
Up to 2,000 MW of data center infrastructure served by co-located combined-cycle gas; initial 58.3 MW generation phase filed with ERCOT May 2, 2026, phased scale-up toward the 2 GW target
Power source
Co-located combined-cycle natural gas on a private-use network: Waha Hub-adjacent fuel supply
Cooling
Not disclosed
Compute
Not disclosed
Construction start
Pre-development active as of April 2026
Est. completion
First power delivery 2027; large-scale generation 2028
Grid strategy
Behind-the-meter gas
County
Reeves
Nearest city
Northern Reeves County (Waha Hub area)
Announced
2026-04-02