Abernathy Campus (TeraWulf × Fluidstack)

Last updated

Likely first Texas site in Anthropic's $50B Fluidstack program
Under construction

A bitcoin-miner-turned-AI campus north of Lubbock: the $9.5B, Google-backstopped buildout that industry reporting links to Anthropic's $50B program, now led by a Fluidstack investor group after TeraWulf sold its 50.1% stake (~$450M, Jul 2026).

240 MWPlanned power168 MW critical IT load / 240 MW gross; JV holds rights to subsequent phases
Developer
Fluidstack-led investor group (TeraWulf sold its 50.1% JV stake Jul 2026)
Owner
Fluidstack-led investor group (~$450M buyout of TeraWulf's majority stake)
Tenant
Fluidstack (25-yr lease); Google backstops $1.3B of lease obligations and holds ~14% of TeraWulf. Widely reported as a likely site for Anthropic's $50B Fluidstack buildout (unconfirmed)
Power source
ERCOT grid (West Texas); TeraWulf power management
Cooling
High-density HPC design; details not disclosed
Compute
Large-scale foundation-model training infrastructure
Construction start
Late 2025
Est. completion
2H 2026 (delivery)
Grid strategy
ERCOT grid
County
Hale, Lubbock
Nearest city
Abernathy (≈22 mi north of Lubbock)
Announced
2025-10-28