2 tracked AI data center projects in Hale County, Texas, 780 MW of disclosed planned capacity across 2 of them. Status: 2 under construction.

2Tracked projects
780 MWDisclosed capacity
4Operators
0.78MW per sq mi1,004.7 sq mi of land

Status

  • 2 Under construction

Power strategy

  • 1 ERCOT grid
  • 1 TBD

Projects

  • Project Caprock (Aligned Data Centers) Under construction · 540 MW · Abernathy

    Aligned Data Centers is building a 540 MW, six-facility campus on 313 acres in Hale County just outside Abernathy, with its first building targeted for early 2027 and Xcel Energy providing dedicated power infrastructure.

  • Abernathy Campus (TeraWulf × Fluidstack) Under construction · 240 MW · Abernathy (≈22 mi north of Lubbock)

    A bitcoin-miner-turned-AI campus north of Lubbock: the $9.5B, Google-backstopped buildout that industry reporting links to Anthropic's $50B program, now led by a Fluidstack investor group after TeraWulf sold its 50.1% stake (~$450M, Jul 2026).