Texas AI Data Center Intelligence Hub
Map
Marker size scales with planned power. Switch the color mode to see development phase or grid strategy.
Grid Strategy
How tracked projects are securing power, and where they stand in ERCOT's interconnection queue.
Disclosed power by grid strategy (GW)
Interconnection status (projects)
Capacity Timeline
AI-relevant capacity additions by quarter from per-project ramp stages. Solid bars = dated phases; faded = estimates.
MW coming online by quarter — dated vs. estimated
AI-relevant capacity only · hover a quarter to see which projects land in it
Key Stats
Disclosed figures only. Click a bar to open the full record.
Planned campus power (MW, log scale)
Disclosed investment / contracted value ($B)
Projects by development phase
Watchlist
Projects carrying live risk flags — opposition, litigation, lost tenants, pauses, or unconfirmed records.
Intelligence
Weekly Intelligence in your inbox, subscribe to The Load Zone
Intel activity by month
The Load Zone
The weekly Texas AI data center news wire.
The Load Zone — Archive
Every edition of the weekly wire, newest first.
Data Table
Texas AI Data Center Projects
Relationship Network
Reports
Companies
Projects
Intelligence
Coverage
Texas AI Datacenter Map
Calendar
What's ahead for tracked projects: construction starts, completions and deal closes, dated and sourced.
Texas Data Centers by County
Hill County
Last updated
No tracked projects in "". Browse all counties.
2 tracked AI data center projects in Hill County, Texas, 7.6 GW of disclosed planned capacity across 2 of them. Status: 2 under construction.
Status
- 2 Under construction
Power strategy
- 1 Behind-the-meter gas
- 1 Hybrid (grid + on-site)
Projects
- Nexus Data Centers Hubbard Under construction · 7.2 GW · Hubbard (between Waco and Corsicana)
A quiet giant that stopped being quiet: a behind-the-meter campus outside tiny Hubbard, now with a $400M, 491,378 sq ft first building on a state construction filing, two nine-figure credit facilities and a private-equity backer, while the gas plant meant to power it is still waiting on its TCEQ air permit and the 7.2 GW headline remains unreconciled with the 600 to 612 MW the trade press describes.
- CyrusOne Bosque–Whitney AI Campus Under construction · 400 MW · Whitney (south of DFW, near Lake Whitney)
CyrusOne's quiet rural pivot: a hyperscale AI cluster around Whitney and Bosque County, nearly $1B in disclosed building permits, a Calpine 400 MW power deal, and the first tower already topped out.
Reports
Companies active here
Intelligence
Tags
Browse projects and reports by topic tag.
Search
Pricing
Every AI data center project in Texas, sourced, dated, and kept current.
Priced for one person with a corporate card.
Free
$0
Everything current, with an account.
- The full dashboard — map, charts, KPIs
- Every tracked project and its current record
- The company relationship graph
- The data table, sortable and searchable
- The Load Zone news wire, all editions
- Every free report, in full
- The most recent intelligence events
Pro
$399 $399/year
Or $39/month. Everything in Free, plus the archive.
- The complete event archive — every sourced development, not the recent window
- Full project records — cost, land, ramp schedule, interconnection detail, confidence and risk flags
- The full report archive, including any marked Pro-only
- Watchlists — follow the projects and counties you care about
- Advanced Map — every tracked site with coordinates, sized by disclosed capacity and coloured by build status
On the roadmap, included when they land
- Email alerts when a project on your watchlist moves
- Isn't this all public information?
- Yes, and that is the point. Every figure here comes from a filing, a company release, a county record or published reporting, and every record shows its sources. What you are paying for is the work of finding it, dating it, structuring it and keeping it current — across hundreds of projects, every week.
- How current is it?
- The dataset version and run date are in the footer of every page, so you can always tell what you are looking at. New developments are logged as dated events rather than silently edited into records.
- What happens when sources disagree?
- We keep both and say so. Records carry a confidence level, disclosed figures are distinguished from estimated ones, and a blank field means nobody published the number — not that it is zero.
- Can I cancel?
- Any time, from your account. You keep access through the period you have paid for.
Account
Your profile, security, and notification settings.
Profile
- Display name
- Status
- Plan
- Member since
Changing your email address is not available yet — it needs a confirmation round-trip to the new address before the change can be trusted.
About you
- Company
- Your role
- What best describes your work
- Company size
- Industry
- What are you tracking?
Security
Other devices
Signs out every session except this one. Use it if you have signed in somewhere you no longer control.
Preferences
Email Subscriptions
Watchlist
Nothing watched yet.
Digest
Exports
API key
Send it as Authorization: Bearer <key> to the export API. It reads the same data your account can, and cannot change anything.
Billing
Nothing to bill.
Contact
Corrections, questions and data requests, including from the companies we cover.
About
TX AI Intel Hub tracks the companies, projects, power demand, investment, and development activity behind Texas' rapidly expanding AI data center market.
The platform brings together sourced project data, dated intelligence events, company relationships, development status, power requirements, investment figures, and risk indicators in one place.
Coverage focuses on projects that are meaningful to the AI infrastructure buildout: hyperscale campuses, major colocation expansions, powered-land developments, and bitcoin-to-AI conversions.
Every material development is logged as a dated intelligence event and tied back to the relevant project, company, and location.
Project records are updated as new information becomes available, and disclosed figures stay distinct from estimates. Confidence levels and risk flags mark the places where the underlying information is incomplete, conflicting, or still developing.
All records go through automated validation before publication, which keeps projects, companies, locations, and timelines consistent with one another.
Many data center intelligence platforms spread their coverage across projects nationwide. TX AI Intel Hub takes a different approach: stay focused on Texas and go deeper.
That means following projects over time, connecting new developments to existing records, tracking changes in power, investment, ownership, construction status, and risk, and building a historical intelligence trail around each project instead of treating every announcement as a standalone data point.
The result is a more complete view of the Texas AI infrastructure market: not just where projects are, but how they are developing, who is involved, and what is changing.
Pro is built for people who need more than a quick project lookup.
The value is in having the surrounding intelligence ready to hand: deeper project context, connected company and location data, development history, research, and the signals that explain where a project stands and where it may be headed.
Instead of piecing together dozens of articles, filings, announcements, and local reports, Pro gives you a structured intelligence layer for following the Texas AI data center market as it develops.
Log in
Sign in to your account.
No account? · ·
Reset
We'll email you a link to choose a new password.
Remembered it?
New password
Choose a new password for your account.
Sign up
Verification unlocks the network graph, the data table, the full report archive and the weekly newsletter.
Already have an account?
Checking your confirmation…
You're confirmed
A couple of things, then you're in.
Already set a password?
You're in
Your free account is ready.
Free
$0
What your account already includes.
- The full dashboard — map, charts, KPIs
- Every tracked project and its current record
- The company relationship graph
- The Load Zone news wire, all editions
Pro
$399 $399/year
Everything in Free, plus the archive.