Denton County

Last updated

4 tracked AI data center projects in Denton County, Texas, 831 MW of disclosed planned capacity across 3 of them. Status: 2 partially operational, 1 pre-construction, 1 paused / at risk.

4Tracked projects
831 MWDisclosed capacity
7Operators
0.95MW per sq mi878.8 sq mi of land

Status

  • 2 Partially operational
  • 1 Pre-construction
  • 1 Paused / at risk

Power strategy

  • 3 ERCOT grid
  • 1 TBD

Projects

  • Core Scientific Denton (CoreWeave) Partially operational · 391 MW · Denton (DFW)

    The earliest and most mature Texas conversion: Core Scientific's Denton bitcoin site has been rebuilding into a ~260 MW CoreWeave GPU campus since 2024, with the final contracted tranche landing in 2026.

  • American Real Estate Partners Westlake Campus Pre-construction · 350 MW · Westlake

    An 87-acre, 1M+ sq ft data center campus from American Real Estate Partners (AREP) along Highway 377 near Westlake, cleared by the town's Planning & Zoning Commission on Aug 4, 2026 over substantial community opposition. AI relevance is not specifically confirmed by the source.

  • CyrusOne DFW1 Carrollton Partially operational · 90 MW · Carrollton

    An operating CyrusOne colocation building in Carrollton, 670,000 sq ft and 90 MW, which surfaced in a loan-distress report rather than a construction filing: a $687.1 million CMBS loan against it ran past its August 9, 2026 maturity and is carried as delinquent while performing. The building also houses the 911 dispatch center for four cities in the Denton County area.

  • Project Tomahawk (Prosper) Paused / at risk · — · Prosper

    A rezoning request before the town of Prosper: Dallas-based White Rose Partners wants about 37 acres near FM 1385 and Parvin Road, in Denton County, for a data center of roughly 225,000 sq ft costing about $580 million. Town staff recommended approval, but the Planning and Zoning Commission voted 7-0 on September 1, 2026 to recommend that the Town Council deny it. The recommendation is advisory and the council votes on September 8. No load figure and no tenant have been published.