Texas AI Data Center Intelligence Hub

Tracking AI data center development activity across Texas.

Loading dataset…
Planned campus power, stacked — click a segment for the full record
0 MW Widths proportional to planned MW · projects without disclosed power not shown

Map

Marker size scales with planned power. Switch the color mode to see development phase or grid strategy.

Color by:

Grid Strategy

How 60+ GW of planned load is routing around ERCOT's 439 GW interconnection queue.

Disclosed power by grid strategy (GW)

Interconnection status (projects)

Capacity Timeline

AI-relevant capacity additions by quarter from per-project ramp stages. Solid bars = dated phases; faded = estimates.

MW coming online by quarter — dated vs. estimated

AI-relevant capacity only · hover a quarter to see which projects land in it

Key Stats

Disclosed figures only. Click a bar to open the full record.

Planned campus power (MW, log scale)

Disclosed investment / contracted value ($B)

Projects by development phase

Watchlist

Projects carrying live risk flags — opposition, litigation, lost tenants, pauses, or unconfirmed records.

Intelligence Feed

Curated, sourced intelligence events. Raw headlines live on The Load Zone →

Intel activity by month

Data Table

Headline fields, sortable. Click a column header to sort, a row to open the full record — or export CSV for every field.

Project Index

Open a card for the full record — specs, companies, risk flags, sources, and intelligence timeline.

Relationship Network

Who leases, backstops, finances, and powers whom. Node size = GW exposure through tracked deals. Click a node.

Reports

Long-form research ingested into the hub, mined for intelligence, archived here with live cross-links.

Companies

Every company with a curated role on a tracked project — who develops, owns, occupies, powers and finances Texas AI data centers.

← All Companies

Portfolio
Counterparties

Projects

Intelligence

Texas AI Datacenter Map

Every tracked site with coordinates on record, sized by disclosed capacity and coloured by build status.

Texas Data Centers by County

Where the buildout is concentrated. Ranked by disclosed planned capacity.

← All Counties
Bell County

1 tracked AI data center project in Bell County, Texas. Status: 1 partially operational.

1Tracked projects
Disclosed capacity
1Operators
1,053.8 sq miCounty area

Status

  • 1 Partially operational

Power strategy

  • 1 TBD

Projects

  • Meta Temple Data Center Partially operational · — · Temple

    A newly reported $1.2B Meta hyperscale campus in Temple, Bell County — described by the source as Meta's second operational Texas data center, though this tracker's only other Meta Texas project (the 1 GW El Paso campus) is still under construction. About 100 permanent jobs reported; power and water figures not disclosed.

Tags

Browse projects and reports by topic tag.

Pricing

The dashboard is free. A subscription buys the history — the complete intelligence archive, and the tools built on it.

Every Texas AI data center project, every megawatt, every deal — sourced, dated, and kept current.

Enterprise platforms cover this market at enterprise prices, sold to companies. This is priced for one person with a corporate card, and it goes deeper on one state than any of them go on fifty.

Free

$0

Everything current, with an account.

  • The full dashboard — map, charts, KPIs
  • Every tracked project and its current record
  • The company relationship graph
  • The data table, sortable and searchable
  • The Load Zone news wire, all editions
  • Flagship reports in full — always, no account needed
  • The two most recent reports in full, and the opening sections of the rest
  • The most recent intelligence events
Create a free account

Pro

$399/year

Or $39/month. Everything in Free, plus the archive.

  • The complete event archive — every sourced development, back to 2021
  • Full project records — cost, land, ramp schedule, interconnection detail, confidence and risk flags
  • The full report archive — every county deep-dive in full, not the opening sections
  • Watchlists — follow the projects and counties you care about
  • Exports — full-record CSV, the complete archive, and a Markdown digest
  • An API key — pull the same exports from a script or a model
  • The Texas AI Datacenter Map — every tracked site with coordinates, sized by disclosed capacity and coloured by build status

On the roadmap, included when they land

  • Email alerts when a project on your watchlist moves
  • The weekly digest email for free accounts

Questions
Isn't this all public information?
Yes, and that is the point. Every figure here comes from a filing, a company release, a county record or published reporting, and every record shows its sources. What you are paying for is the work of finding it, dating it, structuring it and keeping it current — across hundreds of projects, every week.
How current is it?
The dataset version and run date are in the footer of every page, so you can always tell what you are looking at. New developments are logged as dated events rather than silently edited into records.
What happens when sources disagree?
We keep both and say so. Records carry a confidence level, disclosed figures are distinguished from estimated ones, and a blank field means nobody published the number — not that it is zero.
Do I need an account to read it?
No. The dashboard, every project record, the company network and the news wire are open to anyone. An account adds the digest; a subscription adds the history.
Can I cancel?
Any time, from your account. You keep access through the period you have paid for.

Account

Your profile, security, and notification settings.

Contact

Corrections, questions about a record, data requests, or anything the tracker has wrong. Corrections are welcome from anyone, including the companies described here.

About

What this hub tracks, where the data comes from, and how it's built.

A living intelligence tracker for AI data center development across Texas.

The hub compiles AI-relevant data center projects from public reporting — frontier campuses, hyperscaler builds, metro colocation expansions, powered-land programs, and bitcoin-to-AI conversions. Every project carries disclosed-vs-estimated power, cost, and land figures, a per-record confidence level, live risk flags, and a sourced intelligence timeline.

Methodology

Each update run logs new developments as dated events first, then updates project state and refreshes review stamps. A strict validation gate (schema + cross-record integrity) runs before any data reaches the database, so figures stay internally consistent and every claim keeps its sources.

How it's built

Astro on Cloudflare Workers with a D1 (SQLite) edge database via Drizzle, a Zod validation gate, and a vanilla-JS single-page front end. Charts use Chart.js, the site map uses Leaflet, and the relationship graph uses D3.

Member access

Log in

Sign in to your account.

No account? ·

Account recovery

Reset

We'll email you a link to choose a new password.

Remembered it?

Account recovery

New password

Choose a new password for your account.

At least 10 characters, using three of: lowercase, uppercase, number, symbol.

Create account

Sign up

A free account adds the two newest reports in full, and a CSV of the headline fields.

At least 10 characters, using three of: lowercase, uppercase, number, symbol.

Already have an account?

← All Reports

← All Projects