Tracking AI data center development activity across Texas.
Marker size scales with planned power. Switch the color mode to see development phase or grid strategy.
How 60+ GW of planned load is routing around ERCOT's 439 GW interconnection queue.
AI-relevant capacity additions by quarter from per-project ramp stages. Solid bars = dated phases; faded = estimates.
AI-relevant capacity only · hover a quarter to see which projects land in it
Disclosed figures only. Click a bar to open the full record.
Projects carrying live risk flags — opposition, litigation, lost tenants, pauses, or unconfirmed records.
Curated, sourced intelligence events. Raw headlines live on The Load Zone →
Headline fields, sortable. Click a column header to sort, a row to open the full record — or export CSV for every field.
Open a card for the full record — specs, companies, risk flags, sources, and intelligence timeline.
Who leases, backstops, finances, and powers whom. Node size = GW exposure through tracked deals. Click a node.
Long-form research ingested into the hub, mined for intelligence, archived here with live cross-links.
Every company with a curated role on a tracked project — who develops, owns, occupies, powers and finances Texas AI data centers.
Every tracked site with coordinates on record, sized by disclosed capacity and coloured by build status.
Where the buildout is concentrated. Ranked by disclosed planned capacity.
Browse projects and reports by topic tag.
One query across projects, companies, reports, intelligence events, news items, and tags — runs entirely client-side over the loaded dataset.
The dashboard is free. A subscription buys the history — the complete intelligence archive, and the tools built on it.
Every Texas AI data center project, every megawatt, every deal — sourced, dated, and kept current.
Enterprise platforms cover this market at enterprise prices, sold to companies. This is priced for one person with a corporate card, and it goes deeper on one state than any of them go on fifty.
Free
$0
Everything current, with an account.
Pro
$399 $399/year
Founding member price. First 30 only, and it stays $199 for as long as your subscription runs. Enter FOUNDER at checkout.
Or $39/month. Everything in Free, plus the archive.
On the roadmap, included when they land
Your profile, security, and notification settings.
Changing your email address is not available yet — it needs a confirmation round-trip to the new address before the change can be trusted.
Optional. Used to decide what to build and who to write for, and for nothing else. Never sold, never shared. Clear a field and save to delete it.
Signs out every session except this one. Use it if you have signed in somewhere you no longer control.
Nothing to set yet.
There are no per-account display or content preferences in the hub today, so this page would only be able to offer switches that change nothing. It fills in as real options arrive.
Nothing watched yet.
Send it as Authorization: Bearer <key> to the export links above. It reads the same data your account can, and cannot change anything.
Not built yet.
The Load Zone is published on the site each week and the archive is open to everyone. Email delivery is waiting on a sending platform being chosen; your subscription will be managed from here once it is.
Nothing to bill.
Corrections, questions about a record, data requests, or anything the tracker has wrong. Corrections are welcome from anyone, including the companies described here.
What this hub tracks, where the data comes from, and how it's built.
A living intelligence tracker for AI data center development across Texas.
The hub compiles AI-relevant data center projects from public reporting — frontier campuses, hyperscaler builds, metro colocation expansions, powered-land programs, and bitcoin-to-AI conversions. Every project carries disclosed-vs-estimated power, cost, and land figures, a per-record confidence level, live risk flags, and a sourced intelligence timeline.
Each update run logs new developments as dated events first, then updates project state and refreshes review stamps. A strict validation gate (schema + cross-record integrity) runs before any data reaches the database, so figures stay internally consistent and every claim keeps its sources.
Astro on Cloudflare Workers with a D1 (SQLite) edge database via Drizzle, a Zod validation gate, and a vanilla-JS single-page front end. Charts use Chart.js, the site map uses Leaflet, and the relationship graph uses D3.
Sign in to your account.
No account? ·
We'll email you a link to choose a new password.
Remembered it?
Choose a new password for your account.
A free account adds the two newest reports in full, and a CSV of the headline fields.
Already have an account?
A newly reported $1.2B Meta hyperscale campus in Temple, Bell County — described by the source as Meta's second operational Texas data center, though this tracker's only other Meta Texas project (the 1 GW El Paso campus) is still under construction. About 100 permanent jobs reported; power and water figures not disclosed.