2 tracked AI data center projects in Bastrop County, Texas. Status: 2 pre-construction.

2Tracked projects
Disclosed capacity
2Operators
888.2 sq miCounty area

Status

  • 2 Pre-construction

Power strategy

  • 1 Behind-the-meter gas
  • 1 TBD

Projects

  • EdgeConneX Cedar Creek Campus Pre-construction · — · Cedar Creek

    Four data center buildings at 6682 FM 535 in Cedar Creek, Bastrop County, registered with the Texas Department of Licensing and Regulation. EdgeConneX filed EDCAUS13 and EDCAUS14 on August 20, 2026, and a second pair, EDCAUS11 and EDCAUS12, followed. Each building is about 730,000 sq ft, single storey with supporting office space, at $700 million of estimated construction cost apiece, for roughly 2.9 million sq ft and about $2.8 billion combined. Burr Computer Environment Inc. is the owner of record on the filings and EdgeConneX is named as developer. The registrations disclose no IT load, no cooling design, no rack density and no tenant.

  • Pacifico Cedar Creek Campus Pre-construction · — · Cedar Creek

    A data center campus at Cedar Creek in Bastrop County, backed by onsite natural gas generation. The air registration application filed with TCEQ by Pacifico CCK Energy 1 LLC identifies 48 turbines across six model families, about 1,325.76 MW of maximum nominal electrical output, against the roughly 710 MW of onsite generation previously associated with the campus in public. TCEQ registration 185019 was pending at the last status review, and the application states that construction and operation cannot proceed without written approval. Anthropic has been reported to be in lease discussions for the campus, with no lease publicly confirmed.