Planned campus power, stacked — click a segment for the full record
0 MW Widths proportional to planned MW · projects without disclosed power not shown

Map

Marker size scales with planned power. Switch the color mode to see development phase or grid strategy.

Color by:

Grid Strategy

How 60+ GW of planned load is routing around ERCOT's 439 GW interconnection queue.

Disclosed power by grid strategy (GW)

Interconnection status (projects)

Capacity Timeline

AI-relevant capacity additions by quarter from per-project ramp stages. Solid bars = dated phases; faded = estimates.

MW coming online by quarter — dated vs. estimated

AI-relevant capacity only · hover a quarter to see which projects land in it

Key Stats

Disclosed figures only. Click a bar to open the full record.

Planned campus power (MW, log scale)

Disclosed investment / contracted value ($B)

Projects by development phase

Watchlist

Projects carrying live risk flags — opposition, litigation, lost tenants, pauses, or unconfirmed records.

Intelligence Feed

Curated, sourced intelligence events. Raw headlines live on The Load Zone →

Intel activity by month

The Load Zone

The weekly Texas AI data center news wire — twice-weekly sweeps, one edition per week. Items that meet the intelligence bar are promoted into the Intel Feed →

Data Table

Headline fields, sortable. Click a column header to sort, a row to open the full record — or export CSV for every field.

Project Index

Open a card for the full record — specs, companies, risk flags, sources, and intelligence timeline.

Relationship Network

Who leases, backstops, finances, and powers whom. Node size = GW exposure through tracked deals. Click a node.

Reports

Long-form research ingested into the hub, mined for intelligence, archived here with live cross-links.

Companies

Every company with a curated role on a tracked project — who develops, owns, occupies, powers and finances Texas AI data centers.

Portfolio
Counterparties

Projects

Intelligence

Tags

Browse projects and reports by topic tag.

Pricing

The dashboard is free. A subscription buys the history — the complete intelligence archive, and the tools built on it.

Free

$0

Everything current, with an account.

  • The full dashboard — map, charts, KPIs
  • Every tracked project and its current record
  • The company relationship graph
  • The data table, sortable and searchable
  • The Load Zone news wire, all editions
  • Flagship reports in full — always, no account needed
  • The two most recent reports in full, and the opening sections of the rest
  • The most recent intelligence events
  • The weekly digest email, once your address is confirmed
Create a free account

Pro

$299/year

Or $30/month. Everything in Free, plus the archive.

  • The complete event archive — every sourced development, back to 2021
  • Full project records — cost, land, ramp schedule, interconnection detail, confidence and risk flags
  • The full report archive — every county deep-dive in full, not the opening sections

On the roadmap, included when they land

  • Watchlists and email alerts on the projects and counties you follow
  • Exports — CSV and JSON, plus a personal API key
  • The advanced map — pipelines, transmission, generation and service territory on one canvas

Account

Your profile, security, and notification settings.

About

What this hub tracks, where the data comes from, and how it's built.

A living intelligence tracker for AI data center development across Texas.

The hub compiles AI-relevant data center projects from public reporting — frontier campuses, hyperscaler builds, metro colocation expansions, powered-land programs, and bitcoin-to-AI conversions. Every project carries disclosed-vs-estimated power, cost, and land figures, a per-record confidence level, live risk flags, and a sourced intelligence timeline.

Methodology

Each update run logs new developments as dated events first, then updates project state and refreshes review stamps. A strict validation gate (schema + cross-record integrity) runs before any data reaches the database, so figures stay internally consistent and every claim keeps its sources.

How it's built

Astro on Cloudflare Workers with a D1 (SQLite) edge database via Drizzle, a Zod validation gate, and a vanilla-JS single-page front end. Charts use Chart.js, the site map uses Leaflet, and the relationship graph uses D3.

Member access

Log in

Sign in to save watchlists, set alerts, and export briefings.

No account? ·

Account recovery

Reset

We'll email you a link to choose a new password.

Remembered it?

Account recovery

New password

Choose a new password for your account.

At least 10 characters, using three of: lowercase, uppercase, number, symbol.

Create account

Sign up

Get a free account to follow projects and receive intel digests.

At least 10 characters, using three of: lowercase, uppercase, number, symbol.

Already have an account?

← All Reports
Comprehensive Survey of Data Center and Dedicated Power Generation Infrastructure in Haskell County, Texas
Google's three-campus 'power-first' build-out, a nuclear microreactor park, and the CREZ transmission hub behind them

Haskell County's legacy as a CREZ transmission junction — multiple 345kV lines converging on some of the continent's cheapest wind and solar — has made it a primary node of Google's $40B Texas program. Three Homebound/Ascendant special-purpose entities are building the Thelma, Journey, and Ranger campuses (Thelma and Journey now under active construction, paired with Alphabet's newly-acquired Intersect Power 640 MW/1.3 GWh Quantum solar-and-battery park); a separate, unrelated Last Energy nuclear microreactor park proposes 600 MW of behind-the-meter baseload for regional data centers. A thinly-sourced CTS Lonestar project rounds out the county's pipeline but lacks enough disclosed detail to track as a full record.

A CREZ transmission hub becomes a Google county

Haskell County's rise from quiet agricultural county to hyperscale AI hub rests on infrastructure laid down over a decade ago: the Competitive Renewable Energy Zones (CREZ) transmission build-out, completed in 2013, left the county at a junction of multiple high-voltage 345kV lines with some of North America's cheapest wind and solar resources. A long run of utility-scale wind, solar, and battery-storage tax abatements (Horse Creek Wind, Azure Sky, Inertia Wind, King Creek Wind, Quantum BESS — May 2015 through Nov 2024) built the generation base that Google's 'power-first' co-location model now taps directly. Alphabet's Nov 14, 2025 announcement of a historic $40B statewide investment named two of the county's three Google campuses; the third (Ranger) followed with its own tax abatement in April 2026. This report identifies five distinct digital-infrastructure/power-generation assets in the county; four are converted into tracker projects here (Thelma, Journey, Ranger, Last Energy), and a fifth (CTS Lonestar) is held as report-only context pending firmer disclosure.

Project comparison

ProjectDeveloperStatusTotal powerAcresEst. costConstruction startTarget completion
Google Thelma CampusHomebound Group LLCUnder construction~440 MW (est.)Not disclosed (~1.4M sq ft at buildout)~$1.0B Phase 1Jun 18, 2025 (THM1A)Mar 15, 2028 (THM2A)
Google Journey CampusHomebound Group LLCUnder construction~440 MW (proj.)~300 acres$800M (buildings)Apr 1, 2026 (JNR1A)Late Oct 2027 (JNR2A)
Google Ranger CampusAscendant Site Solutions LLCPlanned / pre-constructionNot disclosed~661 acres>$1.0BNot disclosedNot disclosed
Last Energy PWR-20 Microreactor ParkLast Energy Inc.Planned / pre-licensing600 MW (onsite generation)~200 acresNot disclosedNot disclosedNot disclosed
Southeastern Haskell County DC (CTS Lonestar)CTS Lonestar LLCPlanned / pre-construction (vendor procurement)Not disclosedNot disclosedNot disclosedNot disclosedNot disclosed

Together, the report frames these as spanning thousands of acres and exceeding $3.5B in combined Phase 1 capital investment — a figure this tracker treats as the source's own estimate, not independently re-derived.

Preview

You are reading 2 of 9 sections of this report.