Texas AI Data Center Intelligence Hub

Tracking AI data center development activity across Texas.

Loading dataset…
Planned campus power, stacked — click a segment for the full record
0 MW Widths proportional to planned MW · projects without disclosed power not shown

Map

Marker size scales with planned power. Switch the color mode to see development phase or grid strategy.

Color by:

Grid Strategy

How 60+ GW of planned load is routing around ERCOT's 439 GW interconnection queue.

Disclosed power by grid strategy (GW)

Interconnection status (projects)

Capacity Timeline

AI-relevant capacity additions by quarter from per-project ramp stages. Solid bars = dated phases; faded = estimates.

MW coming online by quarter — dated vs. estimated

AI-relevant capacity only · hover a quarter to see which projects land in it

Key Stats

Disclosed figures only. Click a bar to open the full record.

Planned campus power (MW, log scale)

Disclosed investment / contracted value ($B)

Projects by development phase

Watchlist

Projects carrying live risk flags — opposition, litigation, lost tenants, pauses, or unconfirmed records.

Intelligence Feed

Curated, sourced intelligence events. Raw headlines live on The Load Zone →

Intel activity by month

The Load Zone

The weekly Texas AI data center news wire — twice-weekly sweeps, one edition per week. Items that meet the intelligence bar are promoted into the Intel Feed →

Data Table

Headline fields, sortable. Click a column header to sort, a row to open the full record — or export CSV for every field.

Project Index

Open a card for the full record — specs, companies, risk flags, sources, and intelligence timeline.

Relationship Network

Who leases, backstops, finances, and powers whom. Node size = GW exposure through tracked deals. Click a node.

Reports

Long-form research ingested into the hub, mined for intelligence, archived here with live cross-links.

Companies

Every company with a curated role on a tracked project — who develops, owns, occupies, powers and finances Texas AI data centers.

Portfolio
Counterparties

Projects

Intelligence

Tags

Browse projects and reports by topic tag.

Pricing

The dashboard is free. A subscription buys the history — the complete intelligence archive, and the tools built on it.

Free

$0

Everything current, with an account.

  • The full dashboard — map, charts, KPIs
  • Every tracked project and its current record
  • The company relationship graph
  • The data table, sortable and searchable
  • The Load Zone news wire, all editions
  • Flagship reports in full — always, no account needed
  • The two most recent reports in full, and the opening sections of the rest
  • The most recent intelligence events
  • The weekly digest email, once your address is confirmed
Create a free account

Pro

$299/year

Or $30/month. Everything in Free, plus the archive.

  • The complete event archive — every sourced development, back to 2021
  • Full project records — cost, land, ramp schedule, interconnection detail, confidence and risk flags
  • The full report archive — every county deep-dive in full, not the opening sections

On the roadmap, included when they land

  • Watchlists and email alerts on the projects and counties you follow
  • Exports — CSV and JSON, plus a personal API key
  • The advanced map — pipelines, transmission, generation and service territory on one canvas

Account

Your profile, security, and notification settings.

About

What this hub tracks, where the data comes from, and how it's built.

A living intelligence tracker for AI data center development across Texas.

The hub compiles AI-relevant data center projects from public reporting — frontier campuses, hyperscaler builds, metro colocation expansions, powered-land programs, and bitcoin-to-AI conversions. Every project carries disclosed-vs-estimated power, cost, and land figures, a per-record confidence level, live risk flags, and a sourced intelligence timeline.

Methodology

Each update run logs new developments as dated events first, then updates project state and refreshes review stamps. A strict validation gate (schema + cross-record integrity) runs before any data reaches the database, so figures stay internally consistent and every claim keeps its sources.

How it's built

Astro on Cloudflare Workers with a D1 (SQLite) edge database via Drizzle, a Zod validation gate, and a vanilla-JS single-page front end. Charts use Chart.js, the site map uses Leaflet, and the relationship graph uses D3.

Member access

Log in

Sign in to save watchlists, set alerts, and export briefings.

No account? ·

Account recovery

Reset

We'll email you a link to choose a new password.

Remembered it?

Account recovery

New password

Choose a new password for your account.

At least 10 characters, using three of: lowercase, uppercase, number, symbol.

Create account

Sign up

Get a free account to follow projects and receive intel digests.

At least 10 characters, using three of: lowercase, uppercase, number, symbol.

Already have an account?

← All Reports
Industrial Digital Infrastructure in Ector County, Texas
Asset catalog and macro-environmental analysis

Ector County has become a primary node of the Permian's compute transition, anchored by two opposing architectures: the planned 1+ GW Texas Critical Data Centers hybrid campus at Penwell and Cipher Mining's operational 207 MW grid-flexible Odessa mine. Abundant associated gas, CO2 pipeline networks, and favorable development structures collide with water scarcity and rising county-level scrutiny.

Two architectures, one county

Industrial data center development in Ector County is defined by two massive campuses with opposite philosophies: the planned, gigawatt-scale Texas Critical Data Centers (TCDC) AI campus, and the operational, grid-connected Cipher Odessa digital-asset mine. Alongside them sit municipal assets (ECISD's on-premise facilities) and a 10 MW Odessa battery storage project (commissioned Oct 2020) stabilizing the local ERCOT grid.

Texas Critical Data Centers AI Campus

Located in Penwell, unincorporated Ector County west of Odessa, TCDC spans 438 acres (235- and 203-acre acquisitions) with negotiations for an adjacent 54-acre corridor to reach 492 acres. Originally a 50/50 JV between New Era Energy & Digital (NASDAQ: NUAI) and Sharon AI, ownership consolidated in March 2026: New Era acquired Sharon AI's stake for $70M — $10M cash, $10M deferred equity settled Mar 31, and a $50M senior secured note maturing Jun 30, 2026.

Primary Digital Infrastructure leads capital structuring; a non-binding LOI brings Stream Data Centers (Apollo-backed) as builder-operator. Development rides a $290M Macquarie senior secured credit facility, with additional funding closed Apr 14, 2026.

The phased hybrid power model targets speed-to-power while dodging queue congestion:

PhaseCapacityPower sourceTarget
Phase 1200 MW critical ITUtility grid — high-voltage lines near Vistra & Calpine combined-cycle plantsOnline late 2026
Phase 2450 MWOn-site BTM gas — Thunderhead 250 MW reciprocating/turbine plant; EYP-designed 400 MW power islands scalable to 1 GWCommissioning into late 2027
Phase 31+ GW cumulativeFull on-site expansionTBD

Carbon mitigation is unusually aggressive for a Permian BTM build: a Mawgan Capital LOI for the Digital Zero Power program (low-CI gas certificates verified via Context Labs), plus an April 2026 Energy Dome CO2 Battery Plus MoU — capturing OCGT waste heat to evaporate liquid CO2 on discharge, boosting peak output up to 100% without burning additional gas. Site prep and permitting are underway; full infrastructure construction begins 2026.

Preview

You are reading 2 of 5 sections of this report.

Read the full report
← All Projects