Texas AI Data Center Intelligence Hub

Tracking AI data center development activity across Texas.

Loading dataset…
Planned campus power, stacked — click a segment for the full record
0 MW Widths proportional to planned MW · projects without disclosed power not shown

Map

Marker size scales with planned power. Switch the color mode to see development phase or grid strategy.

Color by:

Grid Strategy

How 60+ GW of planned load is routing around ERCOT's 439 GW interconnection queue.

Disclosed power by grid strategy (GW)

Interconnection status (projects)

Capacity Timeline

AI-relevant capacity additions by quarter from per-project ramp stages. Solid bars = dated phases; faded = estimates.

MW coming online by quarter — dated vs. estimated

AI-relevant capacity only · hover a quarter to see which projects land in it

Key Stats

Disclosed figures only. Click a bar to open the full record.

Planned campus power (MW, log scale)

Disclosed investment / contracted value ($B)

Projects by development phase

Watchlist

Projects carrying live risk flags — opposition, litigation, lost tenants, pauses, or unconfirmed records.

Intelligence Feed

Curated, sourced intelligence events. Raw headlines live on The Load Zone →

Intel activity by month

The Load Zone

The weekly Texas AI data center news wire — twice-weekly sweeps, one edition per week. Items that meet the intelligence bar are promoted into the Intel Feed →

Data Table

Headline fields, sortable. Click a column header to sort, a row to open the full record — or export CSV for every field.

Project Index

Open a card for the full record — specs, companies, risk flags, sources, and intelligence timeline.

Relationship Network

Who leases, backstops, finances, and powers whom. Node size = GW exposure through tracked deals. Click a node.

Reports

Long-form research ingested into the hub, mined for intelligence, archived here with live cross-links.

Companies

Every company with a curated role on a tracked project — who develops, owns, occupies, powers and finances Texas AI data centers.

Portfolio
Counterparties

Projects

Intelligence

Tags

Browse projects and reports by topic tag.

Pricing

The dashboard is free. A subscription buys the history — the complete intelligence archive, and the tools built on it.

Free

$0

Everything current, with an account.

  • The full dashboard — map, charts, KPIs
  • Every tracked project and its current record
  • The company relationship graph
  • The data table, sortable and searchable
  • The Load Zone news wire, all editions
  • Flagship reports in full — always, no account needed
  • The two most recent reports in full, and the opening sections of the rest
  • The most recent intelligence events
  • The weekly digest email, once your address is confirmed
Create a free account

Pro

$299/year

Or $30/month. Everything in Free, plus the archive.

  • The complete event archive — every sourced development, back to 2021
  • Full project records — cost, land, ramp schedule, interconnection detail, confidence and risk flags
  • The full report archive — every county deep-dive in full, not the opening sections

On the roadmap, included when they land

  • Watchlists and email alerts on the projects and counties you follow
  • Exports — CSV and JSON, plus a personal API key
  • The advanced map — pipelines, transmission, generation and service territory on one canvas

Account

Your profile, security, and notification settings.

About

What this hub tracks, where the data comes from, and how it's built.

A living intelligence tracker for AI data center development across Texas.

The hub compiles AI-relevant data center projects from public reporting — frontier campuses, hyperscaler builds, metro colocation expansions, powered-land programs, and bitcoin-to-AI conversions. Every project carries disclosed-vs-estimated power, cost, and land figures, a per-record confidence level, live risk flags, and a sourced intelligence timeline.

Methodology

Each update run logs new developments as dated events first, then updates project state and refreshes review stamps. A strict validation gate (schema + cross-record integrity) runs before any data reaches the database, so figures stay internally consistent and every claim keeps its sources.

How it's built

Astro on Cloudflare Workers with a D1 (SQLite) edge database via Drizzle, a Zod validation gate, and a vanilla-JS single-page front end. Charts use Chart.js, the site map uses Leaflet, and the relationship graph uses D3.

Member access

Log in

Sign in to save watchlists, set alerts, and export briefings.

No account? ·

Account recovery

Reset

We'll email you a link to choose a new password.

Remembered it?

Account recovery

New password

Choose a new password for your account.

At least 10 characters, using three of: lowercase, uppercase, number, symbol.

Create account

Sign up

Get a free account to follow projects and receive intel digests.

At least 10 characters, using three of: lowercase, uppercase, number, symbol.

Already have an account?

← All Reports
Cipher Digital's “Colchis” Site: Site Control, Ownership, and the ERCOT Batch Zero Gate
A primary-sourced reassessment of the Red Creek 1 GW proposal — Tom Green County, Texas

Colchis is a real and materially advanced proposed 1 GW HPC/AI campus — but not yet an approved or under-construction facility. Cipher Digital Inc. (renamed from Cipher Mining Feb 20, 2026) controls Colchis LLC at 76% actual ownership (not the often-repeated ~95%, which is a conditional future figure), has funded deposits, holds site control near AEP's Red Creek substation, and has a fully executed 1-GW AEP Direct Connect Agreement. The decisive unresolved issue is ERCOT's Batch Zero large-load process: Cipher's own disclosures make the 1,000 MW capacity and 2028 date expressly conditional on it, and no classification existed as of the Jul 29, 2026 research cutoff. No Colchis tenant has been announced.

Executive summary

Colchis is a real and materially advanced proposed high-performance-computing and artificial-intelligence data center campus, but it is not yet an approved or under-construction 1-gigawatt facility. Cipher Digital Inc. controls the project through Colchis LLC, has funded required development deposits, has site control near AEP's Red Creek substation, and has a fully executed 1-GW direct-connect agreement with AEP. The decisive unresolved issue is ERCOT's new large-load Batch Zero process. Cipher's own disclosures make the proposed 1,000-MW capacity and 2028 energization date expressly subject to that process.

Strongest public evidence of commitment: Cipher acquired 53% of Colchis LLC in October 2025, became managing member, and increased its actual ownership to 76% by March 31, 2026 through additional capital contributions; Cipher recorded $56.6 million of acquired “strategic contracts” associated with Colchis (an accounting value for development rights, not a land price or total cost); the project has a fully executed 1-GW Direct Connect Agreement with AEP, under which AEP is to construct a dual interconnection facility; Cipher says all necessary deposits have been funded and the land is secured.

Largest remaining uncertainties: no ERCOT Batch Zero classification or final load allocation had been made public by the research cutoff; no tenant or executed Colchis lease has been disclosed (Cipher's AWS, Fluidstack/Google, and third-hyperscaler leases concern other campuses); no public campus plan, building count, square footage, cooling design, water source, construction contractor, budget, job estimate, or groundbreaking date was located; no Colchis-specific TCEQ/EPA environmental record, local incentive agreement, or construction permit was located.

Bottom line: Colchis should be tracked as a credible 1-GW proposed HPC/AI campus with substantial site-control and interconnection work completed — not as a fully permitted, financed, tenanted, or construction-ready development. The next major public milestones are Cipher's Aug 4, 2026 business update and ERCOT's expected Aug 7, 2026 Batch Zero classification notices.

1. Project fact sheet

FieldBest-supported public informationConfidence
Formal project nameColchis / Colchis SiteHigh
Development entityColchis LLC, a Delaware LLC and consolidated Cipher subsidiary/JVHigh
Controlling developerCipher Digital Inc. (Nasdaq: CIFR), formerly Cipher Mining Inc.High
Cipher's actual ownership53% acquired Oct 2025; increased to 76% as of Mar 31, 2026High
Publicized future ownership~95% under assumed future HPC lease/development terms — conditional, not currentHigh
Minority partnerNot disclosed by CipherHigh
TenantNone publicly identified for ColchisHigh
Planned capacity1,000 MW / 1 GW, subject to ERCOT batch study and allocationHigh
Utility counterpartyAmerican Electric Power / AEP TexasHigh
InterconnectionExecuted 1-GW Direct Connect Agreement; AEP to build a dual interconnection facilityHigh
ERCOT statusSubmission/study ongoing; Cipher expects Batch Zero inclusion; no public classification as of Jul 29, 2026High
Target energization2028, expressly subject to the batch-study processHigh
Land~620 acres under purchase options at YE2025; later materials say “secured”High
Later land-record claimJun 2026 local records review reported four Tom Green CAD tracts; underlying records not independently retrievedMedium/low
General locationUnincorporated Tom Green County NE of San Angelo, off/near City Farm Rd south of US 67 North, adjacent to Red Creek substationHigh
Exact address/parcel mapNot publicly confirmed by CipherHigh
Construction statusNo campus construction evidence located; interconnection work may proceed in parallel with ERCOT reviewMedium/high
Capex, jobs, water/cooling, local incentives, environmental permitsNot disclosed / none locatedHigh / Medium-high

Confidence convention used throughout this report: High = primary company filing, official government/utility record, or multiple mutually consistent sources; Medium = credible local reporting or reasonable inference from primary records; Low = single secondary source, automated aggregator, or unverifiable claim.

Preview

You are reading 2 of 11 sections of this report.

Read the full report