Texas AI Data Center Intelligence Hub
Map
Marker size scales with planned power. Switch the color mode to see development phase or grid strategy.
Grid Strategy
How tracked projects are securing power, and where they stand in ERCOT's interconnection queue.
Disclosed power by grid strategy (GW)
Interconnection status (projects)
Capacity Timeline
AI-relevant capacity additions by quarter from per-project ramp stages. Solid bars = dated phases; faded = estimates.
MW coming online by quarter — dated vs. estimated
AI-relevant capacity only · hover a quarter to see which projects land in it
Key Stats
Disclosed figures only. Click a bar to open the full record.
Planned campus power (MW, log scale)
Disclosed investment / contracted value ($B)
Projects by development phase
Watchlist
Projects carrying live risk flags — opposition, litigation, lost tenants, pauses, or unconfirmed records.
Intelligence
Weekly Intelligence in your inbox, subscribe to The Load Zone
Intel activity by month
The Load Zone
The weekly Texas AI data center news wire.
The Load Zone — Archive
Every edition of the weekly wire, newest first.
Data Table
Texas AI Data Center Projects
Relationship Network
Reports
Companies
Projects
Intelligence
Coverage
Texas AI Datacenter Map
Calendar
What's ahead for tracked projects: construction starts, completions and deal closes, dated and sourced.
Texas Data Centers by County
Tags
Browse projects and reports by topic tag.
Search
Pricing
Every AI data center project in Texas, sourced, dated, and kept current.
Priced for one person with a corporate card.
Free
$0
Everything current, with an account.
- The full dashboard — map, charts, KPIs
- Every tracked project and its current record
- The company relationship graph
- The data table, sortable and searchable
- The Load Zone news wire, all editions
- Every free report, in full
- The most recent intelligence events
Pro
$399 $399/year
Or $39/month. Everything in Free, plus the archive.
- The complete event archive — every sourced development, not the recent window
- Full project records — cost, land, ramp schedule, interconnection detail, confidence and risk flags
- The full report archive, including any marked Pro-only
- Watchlists — follow the projects and counties you care about
- Advanced Map — every tracked site with coordinates, sized by disclosed capacity and coloured by build status
On the roadmap, included when they land
- Email alerts when a project on your watchlist moves
- Isn't this all public information?
- Yes, and that is the point. Every figure here comes from a filing, a company release, a county record or published reporting, and every record shows its sources. What you are paying for is the work of finding it, dating it, structuring it and keeping it current — across hundreds of projects, every week.
- How current is it?
- The dataset version and run date are in the footer of every page, so you can always tell what you are looking at. New developments are logged as dated events rather than silently edited into records.
- What happens when sources disagree?
- We keep both and say so. Records carry a confidence level, disclosed figures are distinguished from estimated ones, and a blank field means nobody published the number — not that it is zero.
- Can I cancel?
- Any time, from your account. You keep access through the period you have paid for.
Account
Your profile, security, and notification settings.
Profile
- Display name
- Status
- Plan
- Member since
Changing your email address is not available yet — it needs a confirmation round-trip to the new address before the change can be trusted.
About you
- Company
- Your role
- What best describes your work
- Company size
- Industry
- What are you tracking?
Security
Other devices
Signs out every session except this one. Use it if you have signed in somewhere you no longer control.
Preferences
Email Subscriptions
Watchlist
Nothing watched yet.
Digest
Exports
API key
Send it as Authorization: Bearer <key> to the export API. It reads the same data your account can, and cannot change anything.
Billing
Nothing to bill.
Contact
Corrections, questions and data requests, including from the companies we cover.
About
TX AI Intel Hub tracks the companies, projects, power demand, investment, and development activity behind Texas' rapidly expanding AI data center market.
The platform brings together sourced project data, dated intelligence events, company relationships, development status, power requirements, investment figures, and risk indicators in one place.
Coverage focuses on projects that are meaningful to the AI infrastructure buildout: hyperscale campuses, major colocation expansions, powered-land developments, and bitcoin-to-AI conversions.
Every material development is logged as a dated intelligence event and tied back to the relevant project, company, and location.
Project records are updated as new information becomes available, and disclosed figures stay distinct from estimates. Confidence levels and risk flags mark the places where the underlying information is incomplete, conflicting, or still developing.
All records go through automated validation before publication, which keeps projects, companies, locations, and timelines consistent with one another.
Many data center intelligence platforms spread their coverage across projects nationwide. TX AI Intel Hub takes a different approach: stay focused on Texas and go deeper.
That means following projects over time, connecting new developments to existing records, tracking changes in power, investment, ownership, construction status, and risk, and building a historical intelligence trail around each project instead of treating every announcement as a standalone data point.
The result is a more complete view of the Texas AI infrastructure market: not just where projects are, but how they are developing, who is involved, and what is changing.
Pro is built for people who need more than a quick project lookup.
The value is in having the surrounding intelligence ready to hand: deeper project context, connected company and location data, development history, research, and the signals that explain where a project stands and where it may be headed.
Instead of piecing together dozens of articles, filings, announcements, and local reports, Pro gives you a structured intelligence layer for following the Texas AI data center market as it develops.
Log in
Sign in to your account.
No account? · ·
Reset
We'll email you a link to choose a new password.
Remembered it?
New password
Choose a new password for your account.
Sign up
Verification unlocks the network graph, the data table, the full report archive and the weekly newsletter.
Already have an account?
Checking your confirmation…
You're confirmed
A couple of things, then you're in.
Already set a password?
You're in
Your free account is ready.
Free
$0
What your account already includes.
- The full dashboard — map, charts, KPIs
- Every tracked project and its current record
- The company relationship graph
- The Load Zone news wire, all editions
Pro
$399 $399/year
Everything in Free, plus the archive.
Aransas County is a negative-finding case: the county hosts no operational or planned commercial, hyperscale, AI, or cryptocurrency data center, and zero projects in the ERCOT interconnection queue. "Rockport" appears in a statewide 140-project/75,089 MW pipeline tracker (The Texas Land Agent, Apr 2026) and in speculative consulting-firm marketing pages, but the report itself concludes this is speculative land assembly and early-stage grid-queue registration under vague LLC structures (placeholder noise, not a real project) and no tracker record is created for it. What the county actually has is small-scale municipal computing: a May 2026 five-year Nutanix turnkey IT replacement for county government (moving off legacy Broadcom/VMware), a thin, undisclosed-parameters small on-site computing asset tied to a Bushnell Aviation hangar/land lease expansion at Aransas County Airport (self-generated power, no disclosed MW/cost/tenant beyond aviation logistics), and the Town of Fulton's municipal software hosted on remote Tyler Technologies SaaS infrastructure (not a physical Aransas County asset at all). Structural and regulatory barriers explain why large-scale computing is unlikely to arrive: a May 12, 2026 local water-shortage disaster declaration, Hurricane Harvey's 2017 destruction of coastal infrastructure as a standing risk precedent, Texas Coastal Management Program / Mission-Aransas NERR habitat protections, Aransas Pass land-disturbance ordinances, and the county's economic-development focus on tourism, marine science, and its 'Digital Media Friendly Texas Certified Community' branding (software/creative jobs, not server farms).
Bottom line: no data center projects in Aransas County
This report's core finding is negative: Aransas County has zero active or planned commercial, hyperscale, AI, or cryptocurrency data centers, and zero projects progressing through the ERCOT interconnection queue. Nothing in the source document supports a tracker project record, and none is created by this ingestion. The report is archived in full because it is valuable negative intelligence — confirmation that the county has been assessed and found to have no qualifying digital infrastructure — rather than leaving the county unaddressed.
The speculative "Rockport" pipeline entry — debunked, not ingested
An April 2026 statewide pipeline report published by The Texas Land Agent put the planned Texas data center pipeline at 140 projects / approximately 75,089 MW, and listed "Rockport" (the Aransas County seat) as holding a "substantial planned footprint." Local journalist Len Hayward (The Rockport Pilot, via Southtexasnews) published follow-up questioning whether Rockport-Fulton could genuinely support a commercial computing campus. The source report's own analysis concludes this listing reflects speculative land assembly and early-stage ERCOT grid-interconnection registration filed under vague LLC structures — a placeholder in the utility queue that rarely converts to physical construction — not a concrete development plan. Separately, consulting firm Data Centers Deployed LLC runs Aransas County–targeted marketing pages (site selection, feasibility, commissioning/IST) that imply a high-tech local ecosystem but are speculative sales templates, not evidence of a physical project. No project record is created for "Rockport" or any other entity named in these speculative listings — consistent with the report's own conclusion.
| Item | Substance | Disposition |
|---|---|---|
| "Rockport" statewide pipeline entry | Undisclosed developer, MW, land size, cost; "substantial planned footprint" per Apr 2026 pipeline tracker | Debunked by the source report as speculative land-banking / grid-queue placeholder — no project created |
| Data Centers Deployed LLC marketing pages | Site-selection/feasibility/commissioning consulting templates targeting Aransas County | Sales marketing, not a physical project — no project created |