Soluna Project Kati 1 & 2

Last updated

Willacy County renewable computing campus
Partially operational

The southernmost AI play in Texas: Soluna's wind-powered Willacy County campus absorbed Galaxy's displaced bitcoin miners and is now adding a 100+ MW GPU-ready phase with Metrobloks.

350 MWPlanned power
Developer
Soluna Holdings (+ Metrobloks for Kati 2)
Owner
Soluna JV
Tenant
Galaxy Digital (48 MW mining hosting, Kati 1); neocloud LOI for Kati 2
Power detail
350 MW campus scope per formalized JV (Jun 2026), Kati 1: 83 MW (bitcoin hosting, incl. 48 MW Galaxy contract); Kati 2: 100+ MW AI/HPC first phase
Power source
Behind-the-meter wind (EDF Renewables + Masdar PPA; Las Majadas expansion talks); ERCOT-connected flexible load
Cooling
Modular high-density design (Kati 2)
Compute
Bitcoin hosting (Kati 1) → GPU-ready AI/HPC (Kati 2)
Construction start
Sep 2025 (Kati groundbreaking)
Est. completion
Kati 1 ramping 2026; Kati 2 phased
Grid strategy
Renewable-matched
County
Willacy
Nearest city
Raymondville / near McAllen (Rio Grande Valley)
Announced
2026-01-28