Project Mustang (Taylor)

Last updated

Pre-construction

A 665-acre data center proposal east of Taylor in Williamson County, between FM 112 and US 79, from PowerHouse Data Centers and Big Watt Digital. The city's project page puts proposed on-site gas generation at 477 MW using reciprocating engines. The developers withdrew their annexation and zoning application to the City of Taylor on or about September 9, 2026 and are pursuing the site in unincorporated Williamson County, with talks over a voluntary annexation continuing. No tenant, IT load, cost or construction date has been published.

Planned power
Developer
PowerHouse Data Centers with Big Watt Digital
Power detail
477 MW of on-site natural gas generation is proposed, using reciprocating internal combustion engines for prime power. That is generation capacity. No IT load or critical load figure has been published for the campus.
Power source
Proposed on-site natural gas prime power, 477 MW of reciprocating internal combustion engines, reducing draw from the Oncor system
Grid strategy
Behind-the-meter gas
County
Williamson
Nearest city
Taylor