Lancium Fort Stockton Clean Campus

Last updated

Fort Stockton Clean Campus
Partially operational

Pecos County's early-mover grid-tied compute campus: Lancium's 2021 Chapter 381 deal put a ~200-acre, 325 MW-master-planned flexible load on the ERCOT grid at Fort Stockton, an interruptible Controllable Load Resource absorbing excess West Texas renewables for bitcoin and high-throughput cloud workloads. Included in scope for its compute-beyond-bitcoin posture and CLR significance.

325 MWPlanned power
Developer
Lancium, LLC
Owner
Lancium, LLC (a Blackstone company, per Jul 2026 county reporting)
Tenant
Bitcoin mining operators + high-throughput cloud computing workloads
Power detail
325 MW ultimate capacity per Jul 2026 county report; 25 MW active from Phase 1. Expansion phasing undisclosed and, per Jan 2024 reporting, blocked at ERCOT rather than at the site: substations are being built for the ~300 MW step-up but ERCOT has not allowed it online.
Power source
ERCOT grid via TNMP: interruptible Controllable Load Resource (Lancium Smart Response); Broad Reach Power battery storage partnership
Cooling
Not disclosed
Compute
Industrial flexible compute: bitcoin mining plus high-throughput computational workloads
Construction start
Sep to late 2021
Est. completion
Phase 1 online Q1 to Q2 2022; expansion toward 325 MW ongoing, timeline undisclosed
Grid strategy
ERCOT grid
County
Pecos
Nearest city
Fort Stockton
Announced
2021-09-07