Data City Texas

Last updated

Energy Abundance Development Corp. campus
Pre-construction

A moonshot on the border: a 50,000-acre, 5 GW behind-the-meter campus near Laredo that aims to run entirely on renewables and, eventually, green hydrogen from salt-dome storage.

5.0 GWPlanned power5 GW at full buildout, pitched as the world's largest behind-the-meter, 100% renewable data center hub
Developer
Energy Abundance Development Corporation
Owner
Energy Abundance Development Corporation
Tenant
TBD: designed to host large AI workloads
Power source
Wind + solar + batteries + dual-fuel gas turbines (Texas natural gas → 100% green hydrogen from the 2 TWh “Hydrogen City” salt-dome storage facility)
Cooling
Centralized cooling optimized for direct-to-chip liquid cooling; power-dense racking
Compute
Designed to support Nvidia Blackwell and Rubin chip generations
Construction start
2026 (phase 1 target)
Est. completion
Phase 1 2026; 5 GW over multi-year phases
Grid strategy
Renewable-matched
County
Webb
Nearest city
Laredo
Announced
2025-03-21