← All Projects

Cipher Apollo

Last updated

Apollo
Pre-construction

Cipher Digital's eleventh site and its newest Texas position: an option on roughly 288 acres within 25 miles of San Antonio for up to 900 MW, submitted into ERCOT's Batch Zero. Nothing beyond the option and the interconnection filing is public. Cipher has named no county, no transmission point, no utility and no tenant.

900 MWPlanned power
Developer
Cipher Digital
Owner
Cipher Digital (option holder; no fee title disclosed)
Power detail
Up to 900 MW of gross grid capacity, submitted as a studied load in ERCOT's Batch Zero under the updated large-load interconnection process. Cipher's portfolio timeline places the capacity in its 2030 and later band, and one report puts first capacity at 2031. Both the figure and the timing are conditional on the ERCOT batch process.
Est. completion
2030 or later on Cipher's own portfolio timeline, with one report citing 2031. Conditional on ERCOT Batch Zero.
Grid strategy
ERCOT grid
Nearest city
San Antonio (the site is reported to sit within 25 miles of the city; Cipher has not named a town or county)
Announced
2026-08-04