Regulatory August 3, 2026 Cipher “Colchis” JV Site

ERCOT pauses Batch Zero review, leaving Colchis without a classification

ERCOT paused Batch Zero classification and study activity on August 3, 2026 after Governor Greg Abbott directed a verification process for data center large loads before they advance through interconnection.

Preview

You are reading the opening of this brief.

Read the full brief