Chevron-Microsoft-Engine No. 1 $7B Reeves County power deal surfaces in April 2026 coverage, months before the formal blog

Secondary coverage in early April 2026 described an exclusive development agreement: Chevron and Engine No. 1 building a ~$7B gas-fired plant (GE Vernova H-class turbines) inside the perimeter of a ~7,000-acre Microsoft site near Pecos, entirely behind the meter. April-era sources put capacity at 2.5 to 2.595 GW.

Preview

You are reading the opening of this brief.

Read the full brief