Taylor County

Last updated

2 tracked AI data center projects in Taylor County, Texas, 2.1 GW of disclosed planned capacity across 2 of them. Status: 1 partially operational, 1 under construction.

2Tracked projects
2.1 GWDisclosed capacity
7Operators
2.29MW per sq mi915.5 sq mi of land

Status

  • 1 Partially operational
  • 1 Under construction

Power strategy

  • 1 Behind-the-meter gas
  • 1 Hybrid (grid + on-site)

Projects

  • Stargate Abilene Partially operational · 1.2 GW · Abilene

    The flagship Stargate campus and the most complete frontier-AI build in the country. Developed by Crusoe and leased by Oracle for OpenAI, it is the anchor of Abilene's emergence as a national AI hub.

  • Crusoe–Microsoft Abilene AI Factory Campus Under construction · 900 MW · Abilene

    Microsoft stepped into capacity originally envisioned for OpenAI/Oracle, leasing a new 900 MW two-building campus that Crusoe is building next to the Stargate site, making Abilene a 2.1 GW AI hub.