Hays County

Last updated

2 tracked AI data center projects in Hays County, Texas, 1.2 GW of disclosed planned capacity across 1 of them. Status: 1 under construction, 1 pre-construction.

2Tracked projects
1.2 GWDisclosed capacity
3Operators
1.77MW per sq mi676.9 sq mi of land

Status

  • 1 Under construction
  • 1 Pre-construction

Power strategy

  • 1 Behind-the-meter gas
  • 1 TBD

Projects

  • CloudBurst San Marcos Data Center I Under construction · 1.2 GW · San Marcos / New Braunfels

    A gas-powered 1.2 GW "GigaCenter" rising in the fast-growing Austin-San Antonio corridor, and the lightning rod for San Marcos's packed city-council fights over AI data centers.

  • PowerHouse Uhland Campus Pre-construction · — · Uhland (Austin-San Antonio corridor)

    PowerHouse's second Texas play after the 1.8 GW Grand Prairie JV: a 500-acre AI campus near Uhland, joining CloudBurst San Marcos and Tract Caldwell in the Austin-San Antonio corridor's accelerating land rush.