Caldwell County

Last updated

3 tracked AI data center projects in Caldwell County, Texas, 4.1 GW of disclosed planned capacity across 2 of them. Status: 3 pre-construction.

3Tracked projects
4.1 GWDisclosed capacity
3Operators
7.61MW per sq mi544.5 sq mi of land

Status

  • 3 Pre-construction

Power strategy

  • 2 ERCOT grid
  • 1 TBD

Projects

  • Tract Caldwell County Park Pre-construction · 4.0 GW · Lockhart area (between Austin and San Antonio)

    A powered-land play in the booming Austin-San Antonio corridor: nearly 3,000 acres master-planned for more than 4 GW, with the first 250 MW contracted for Q1 2028.

  • Prime Austin Campus (Project Snow) Pre-construction · 144 MW · Lockhart

    A 206-acre Lockhart campus from Prime Data Centers, master-planned for eight buildings and ~2M sq ft, with the first two buildings filed for construction in May 2026, untracked by this dataset and sitting in the same county as Tract's park.

  • PowerHouse Uhland Campus Pre-construction · — · Uhland (Austin-San Antonio corridor)

    PowerHouse's second Texas play after the 1.8 GW Grand Prairie JV: a 500-acre AI campus near Uhland, joining CloudBurst San Marcos and Tract Caldwell in the Austin-San Antonio corridor's accelerating land rush.